4. Migration strategy selection
Choose between brownfield, greenfield, and selective (bluefield) transition based on the evidence gathered in the readiness assessment — process fitness, custom-code footprint, and change capacity — rather than on a default industry preference.
5. Partner selection
Evaluate systems integrators against demonstrated SAP-specific expertise, a documented methodology, and verifiable references, with independent oversight structured into the relationship from the outset rather than added after a problem has already surfaced.
6. Execution: build and data migration
The technical core of the program: system conversion or new build, custom-code remediation, and a disciplined data migration workstream covering profiling, cleansing, governance, validation, and reconciliation.
7. Testing
Integration and user-acceptance testing scoped to the landscape’s actual complexity rather than compressed to protect a fixed date — testing scope should be allowed to influence the timeline, not only the reverse.
8. Go-live and cutover
A rehearsed cutover plan, including a genuine rollback contingency, executed with clear ownership for both technical execution and business-process sign-off.
9. Post-migration optimization
Hypercare stabilization immediately following go-live, followed by a deliberate optimization phase in which the organization begins using capabilities — analytics, embedded intelligence, standardized processes — that a like-for-like technical migration alone would not automatically activate.
What tends to determine whether the sequence holds
None of these nine stages is unusual or proprietary — most experienced SAP practitioners would recognize this general sequence. What varies enormously between organizations is discipline: whether each stage is genuinely completed with evidence before the next one begins, or whether stages get compressed, run in parallel under time pressure, or skipped outright because an earlier stage was rushed. A readiness assessment completed thoroughly in month one tends to prevent exactly the kind of mid-program surprise — an undiscovered integration, an unaddressed data-quality issue, an under-resourced testing phase — that later forces stages five through eight to be compressed under pressure.
For an organization beginning this process today, the practical first move is rarely a request for implementation proposals. It is an honest, evidence-based readiness assessment — the kind that produces a specific, defensible answer to “where do we actually stand,” which is the only reliable foundation for every stage that follows.